How do I assign a shift in Manage Schedule?

 
  1. Choose Employees from the navigation list.
  2. Select the employee you wish to work with from the list.
  3. Choose Manage Employee.  Use the drop down menu to select Manage Schedule.
  4. Highlight the day or days you wish to apply a shift to.
  5. Press the assignment icon .
  6. In the first drop down menu select Assign if necessary.
  7. In the second drop down menu select Shift if necessary.
  8. In the third drop down menu select your desired shift from the drop down menu of available shifts.
  9. Press Save to apply the shift(s).

 

Wed 12/05/2018